What the NUPRC requires¶
The Nigerian Upstream Petroleum Regulatory Commission (NUPRC) regulates upstream oil and gas in Nigeria under the Petroleum Industry Act 2021. Its methane and greenhouse gas obligations come from a small number of instruments, and FieldTruth holds them in a rule pack: each obligation transcribed from the regulator's own published text, with the document and section it came from.
Primary sources
The rule pack was compiled from the instruments themselves, read in full, not from secondary reporting. Where the regulator's own documents disagree with each other, the pack says so rather than choosing. This page is a summary; it is not legal advice.
The instruments¶
| Instrument | Issued | What it does |
|---|---|---|
| NUPRC Guide 0024-2022, Guidelines for Management of Fugitive Methane and Greenhouse Gases Emissions in the Upstream Oil and Gas Operations in Nigeria | 5 November 2022 | The main rulebook: leak detection and repair, flaring and venting, equipment standards, inventory and reporting, sanctions |
| Gas Flaring, Venting and Methane Emissions (Prevention of Waste and Pollution) Regulations | 2023 | Daily records of gas produced, flared and vented, and the monthly gas return |
| Directive on Implementing Standardized Templates and Transitioning to Measurement-Based Methane and GHG Reporting | 11 April 2026 | Tier 2 from Q3 2026, Tier 3 from January 2027, mandatory templates |
| GHG Emissions Inventory Reporting template, with its Excel workbook | April 2026 | The form of the quarterly inventory |
| GHG Emissions Management Plan (GHGEMP) template | April 2026 | The form of the management plan |
Who it applies to¶
The guidelines apply to all oil and gas operators and service providers. The quarterly inventory is mandatory for oil and gas production facilities, export terminals, and gas processing, gathering and boosting stations, and any other facility the Commission designates.
The obligations, grouped¶
There are 36 obligations in the rule pack. They fall into these groups.
Measurement, reporting and verification¶
| Code | Obligation | Source |
|---|---|---|
| NG-MRV-001 | Report at IPCC Tier 2 or better, from Q3 2026 | 2026 directive |
| NG-MRV-002 | Transition fully to Tier 3 measurement-based MRV from January 2027 | 2026 directive |
| NG-MRV-003 | Submit on the Commission's standardised templates | 2026 directive |
| NG-MET-035 | State the GWP basis used; energy intensity uses CH₄ = 82.5 | Template section 4; guidelines Appendix D |
Records and reporting¶
| Code | Obligation | Source |
|---|---|---|
| NG-REC-024 | Keep daily records of gas produced, flared and vented, from installed meters, for at least three years | 2023 regulations |
| NG-RPT-025 | Monthly gas data return within 21 days of month end | 2023 regulations |
| NG-RPT-026 | Quarterly GHG inventory covering CO₂, CH₄ and N₂O | Guidelines 2.1(iv), 4.1(i) |
| NG-RPT-027 | Annual compliance report within the first quarter | Guidelines 3.2.4(4) |
| NG-RPT-028 | Baseline inventory covering at least three historical years | Inventory template section 5 |
| NG-RPT-029 | Report unplanned emission incidents and satellite alerts | Inventory template section 3 |
| NG-RPT-030 | Report emission intensity per barrel of oil equivalent | Inventory template section 7 |
| NG-VER-031 | State third-party verification used and level of assurance | Inventory template 7; GHGEMP 8 |
| NG-CRT-036 | MRV Compliance Certificate for operators that fully comply | Inventory template section 8 |
Management plan¶
| Code | Obligation | Source |
|---|---|---|
| NG-GHG-004 | Maintain a GHG Emissions Management Plan | Guidelines 2.2 |
| NG-GHG-005 | Reduce energy intensity by 2.5% a year against a 2020 base | Guidelines 2.2(ii)(e), Appendix D |
Leak detection and repair¶
| Code | Obligation | Source |
|---|---|---|
| NG-LDAR-006 | Inspection frequency onshore: one in year one, two in year two, four a year after | Guidelines 3.2.2(1) |
| NG-LDAR-007 | Inspection frequency offshore | Guidelines 3.2.2(2) |
| NG-LDAR-008 | Repair a large leak (50,000 ppmv) within 5 working days | Guidelines 3.2.4(1)(i) |
| NG-LDAR-009 | Repair a small leak (5,000 ppmv) within 14 days | Guidelines 3.2.4(1)(ii) |
| NG-LDAR-010 | Critical components: minimise within one day, repair at next shutdown or within a year | Guidelines 3.2.4(1)(iii) |
| NG-LDAR-011 | Verify a repair and re-monitor within 15 days | Guidelines 3.2.4 |
| NG-LDAR-012 | Company-wide and site-specific inspection plans | Guidelines 3.2.4(3), Appendix A |
| NG-REC-023 | Audio, visual and olfactory inspections | Guidelines 3.2.3(vii) |
Flaring and venting¶
| Code | Obligation | Source |
|---|---|---|
| NG-FLR-013 | Flare destruction removal efficiency of at least 98% | Guidelines 3.3.2(1) |
| NG-FLR-014 | Reignite an unlit flare within 48 hours | Guidelines 3.2.3(iv) |
| NG-FLR-015 | Record the state of every flare at each inspection | Guidelines 3.2.3(iii) |
| NG-FLR-016 | Address a sputtering or smoking flare | Guidelines 3.2.3(v) |
| NG-VNT-017 | Cold venting prohibited without a waiver | Guidelines 3.3.1 |
Equipment¶
| Code | Obligation | Source |
|---|---|---|
| NG-EQP-018 | Phase out gas-driven pneumatic controllers over five years | Guidelines 3.4.1 |
| NG-EQP-019 | Phase out venting pneumatic pumps over five years | Guidelines 3.4.2 |
| NG-EQP-020 | Compressor seals and rod packing | Guidelines 3.4.3, 3.4.4 |
| NG-EQP-021 | Glycol dehydrators: 95% reduction in vent emissions | Guidelines 3.4.5 |
| NG-EQP-022 | Liquid storage tanks above 2 t/yr VOC to vapour recovery | Guidelines 3.4.6 |
Targets¶
| Code | Obligation | Source |
|---|---|---|
| NG-TGT-032 | Zero routine flaring by 2030 | Guidelines 1.2(iii), 1.3 |
| NG-TGT-033 | 60% reduction in fugitive methane; the date is inconsistent across sources | Guidelines 1.2(iii) and 1.3 |
| NG-TGT-034 | National net zero by 2060 | 2026 directive |
The 60% target date is not settled
Section 1.2(iii) of the guidelines says the 60% methane reduction is by 2030. Section 1.3 of the same document says 2031. FieldTruth records both citations and does not pick one.
Which of these FieldTruth checks¶
FieldTruth is an emissions measurement and reporting tool. It checks the nine obligations that turn on emissions data: NG-MRV-001, NG-MRV-002, NG-MRV-003, NG-FLR-013, NG-REC-024, NG-RPT-025, NG-RPT-026, NG-RPT-028 and NG-MET-035. Each receives one of these answers:
| Answer | Meaning |
|---|---|
| Compliant | The evidence shows the obligation is met |
| At risk | Due or nearly due, and the evidence is partial |
| Non-compliant | The evidence shows it is not met |
| Not yet due | The obligation has not started |
| Not covered | Outside what FieldTruth checks, with the reason |
The remaining obligations depend on leak survey records, equipment registers, Commission waivers and written plans. They are listed on the compliance screen as not covered, each with the reason, rather than shown as something the software failed to check. See What FieldTruth does not cover.
Sanctions¶
Appendix F of the guidelines treats non-compliance as a violation of the Petroleum Industry Act 2021 and associated regulations. The listed consequences include fines, temporary or permanent revocation of a licence or permit, and withdrawal or non-approval of the Oil and Gas Industry Service Permit. The monetary penalties are set in separate fees and rents regulations.