Compliance and Tier 3 readiness¶
Compliance¶
The compliance screen evaluates an asset against every obligation in the active rule pack, today. For each one it shows the obligation, where it comes from, the answer, and the evidence behind the answer.
| Answer | Meaning |
|---|---|
| Compliant | The evidence shows it is met |
| At risk | Due or nearly due, with partial evidence, or a deadline close enough to act on; the days left are shown |
| Non-compliant | The evidence shows it is not met |
| Not yet due | It has not started |
| Not covered yet | Outside what FieldTruth checks, with the reason |
The obligations FieldTruth checks, and how:
| Code | Obligation | How it is checked |
|---|---|---|
| NG-MRV-001 | Tier 2 or better | The methodology tier of the most recent run |
| NG-MRV-002 | Transition to Tier 3 | The measured share of material sources against the 90% threshold, and the date |
| NG-MRV-003 | Standardised templates | An issued report on the Commission's template |
| NG-FLR-013 | Flare efficiency at least 98% | The efficiency the run used, and whether it was measured |
| NG-REC-024 | Daily records | No gap in flare or vent coverage in the period |
| NG-RPT-025 | Monthly return within 21 days | The date the report was issued against the period end |
| NG-RPT-026 | Quarterly inventory | An issued inventory for the quarter |
| NG-RPT-028 | Baseline with stated uncertainty | Uncertainty is stated on the run |
| NG-MET-035 | GWP basis stated | The basis recorded on the run |
Why "not covered" is not a failure¶
Most of the 36 obligations turn on evidence FieldTruth does not hold: leak survey records, repair logs, equipment registers, Commission waivers and written management plans. FieldTruth is an emissions measurement and reporting tool, and it would be dishonest to show those as checks it ran and passed, or as checks it failed. They are shown as not covered yet, each with the reason, so the list is complete and nobody mistakes it for a clean bill of health. See What FieldTruth does not cover.
Tier 3 readiness¶
The readiness view answers one question: how far is this asset from measurement-based reporting, and what should be metered next?
The measured fraction¶
Of the asset's material sources, the share whose measurement state is measured. FieldTruth treats 90% as ready for Tier 3. The figure is shown on every asset and moves the moment somebody marks a source as measured.
The gap register¶
Every material source that is not measured, ranked by the tonnes of CO₂e it contributes. The source at the top is the one whose metering would move the inventory most.
The ranking is by tonnes and only by tonnes. If Jev is enabled it adds an estimate of how difficult each source is to meter, shown beside the ranking as advice. It never reorders the list, because the order is a fact about the inventory and the difficulty is an opinion.