Uncertainty¶
Every emissions figure is uncertain. The question is by how much, and whether the report says so honestly.
Two rules¶
1. Independent uncertainties combine in quadrature. For a product, such as a volume times a factor, the relative uncertainties combine as
and for a sum, such as a facility total, the absolute uncertainties combine the same way.
Example: a volume known to ±5% multiplied by a factor known to ±50% gives a result known to √(5² + 50²) = ±50.2%. The factor dominates, which is why measuring moves the total more than anything else.
2. Missing is not zero. If any input has no stated uncertainty, the result's uncertainty is not stated. It is never quietly set to zero. A report with tight error bars that were never computed is the most dangerous thing an emissions tool can produce.
IPCC ranges¶
The IPCC often quotes uncertainty as an asymmetric range, such as minus 12.5% to plus 800%. There is no honest way to turn that into one symmetric figure. FieldTruth takes the larger of the two magnitudes, because on a methane inventory understating the upside is worse than overstating it: the upside is where the unreported emissions are.
The independence assumption¶
Quadrature assumes the errors are independent. Often they are not: two flare meters of the same model, calibrated by the same contractor, tend to be wrong in the same direction. FieldTruth does not model correlated errors yet, so every line carries the basis quadrature, independent, and the report prints it rather than leaving the assumption in the arithmetic.